Bus on Demand

Project information

Index: 1288R4
Acronym:D-AIR
Priority:2: Environment and risk prevention
Sub Theme:Energy and sustainable transport
Location ESPAÑA ESTE El Prat de Llobregat Cataluña Start/End date of the practice
Start: 16 May 2014
End: Running

Topic of the practice

CO2-reduction through surface accessibility by a transport system for employees working in/around the airport (during hours they cannot use public transport or as an alternative for their own cars).

Good Practice Information

During the study visit to Charles de Gaulle airport El Prat learnt from the project Fileo that provides bus services to the workers of the area of the airport. To adapt to the situation, El Prat contacted with the bus metropolitan authority and with the company Capmar in order to implement a bus on demand service redesigning the last part of the way of a bus line (PR-3). Thus the city implemented
2 new bus stops at the industrial area of the airport that can be used by the workers just pushing a button that (by Wi-Fi) informs the nearest bus that there is a traveler waiting there and the traveler in a few seconds about the waiting time of the arrival of the bus. If the passenger is at the bus he just has to ask the driver that he wants to go to the industrial bus stops.

Evidence of success

The cost of starting this good practice is low: about € 27.500. The environment benefits due to lesser use of private cars by workers of Industrial and airport areas. Based on the first results it is estimated that the measure will save about 800 tones of CO2 a year.

Contact details to obtain further information on the practice

M. Teresa Giralt

City of El Prat de Llobregat

Giralt @elprat.cat

www.elprat.cat

Annex completed on: 07-01-2014

As of 31 December 2015, this website is no longer updated. Follow news on interregional cooperation at www.interregeurope.eu